Send a $1,485 Tesla Wall Connector install quote with the $400 IRA tax credit and $500 utility rebate built in. Run the panel load calc to verify capacity. Track which San Francisco PG&E rebate paid for the $585 net.
$1 for 14 days, then $19/mo. Card required. Cancel any time.
$79/mo vs $99–$299 industry standard·20-min migration from HCP, Jobber, ServiceTitan·No per-seat fees, ever
Features EV charger installers actually use
Built for EV Charger Installation Companies
The five things that decide whether you book the $1,485 Tesla Wall Connector install or watch it go to the next electrician include on-site quotes with IRA 30C tax credit and utility rebate math. You need a panel load calc to verify capacity or quote the panel upgrade. You need 1-visit install dispatch and photo records for utility rebate inspection. You also need Google Ads ROI on $35-a-click EV charger keywords. All in one app. Built by people who have installed a Tesla Wall Connector and 60-amp circuit on a 1998 Bay Area panel that needed a new 200-amp service first.
On-Site Quotes with Tax Credit and Rebate Math
Walk the garage and photograph the panel plus meter plus proposed charger location plus planned cable run. Run the panel load calc for existing load plus new 60-amp EV circuit. Customer picks Tesla Wall Connector for $475 hardware plus $1,010 install for $1,485 or ChargePoint Home Flex for $699 plus $1,010. Build the quote in 6 minutes. Subtract IRA 30C credit of $400 and PG&E rebate of $500 for $585 net. Customer signs digitally and pays a 25 percent deposit before you back out of the driveway.
Panel Load Calc Built In
Claver runs the NEC 220.83 load calc for existing dwelling load plus new 60-amp EV circuit. The charger uses 48A continuous on a 60A breaker per NEC 625.40. If the panel is at 78 percent capacity the EV circuit fits. If at 85 percent you need a load-management device. If at 92 percent you need a 200-amp service upgrade for $2,800 added to the quote. No panel won't take it surprise at install Day 1.
1-Visit Install Dispatch
Materials arrive Friday. Saturday morning the tech arrives with the Tesla Wall Connector or ChargePoint plus the 60A 2-pole breaker. He brings the 6/3 NM-B cable or 6 AWG THHN in conduit for outdoor runs plus the wall-mount bracket and hardware. The job takes 2 to 3 hours total. The customer's car charges that night.
Photo Records for Utility Rebate
Pre-install photos show the panel plus meter plus proposed charger location with measurements. During install photos show the panel breaker installed at 60A with proper torque plus cable run secured plus wall mount and charger installed and activated. Post-install photos show the installed charger with model and serial visible as proof of qualifying Energy Star Level 2 unit plus commissioning data for charger handshake with vehicle test. The PG&E rebate inspector accepts the photos in 5 days instead of 5 weeks.
Google Ads and Lead Source ROI
EV charger keywords cost $25 to $50 per click. Claver captures the click ID and follows it through quote to signed contract to final payment and rebate received. Tesla Wall Connector installer San Francisco generated 18 clicks and 12 quotes and 6 signed jobs worth $8,910. EV charger installer near me generated 84 clicks and 1 quote and $1,485 in jobs.
Included on Crew at $39 a month or Business at $79 a month. Starter ($19/mo) covers unlimited jobs, quotes, invoices, Stripe payments, customer portal, online booking, recurring billing, and CSV export. Step up to Crew for texting, AI, and dispatch.
Why EV charger installers switch
Why EV Charger Installation Companies Choose Claver
The Fastest-Growing Electrical Category
EV charger installation is the fastest-growing residential electrical category. Every Tesla and Rivian and Ford F-150 Lightning and Hyundai Ioniq 5 owner needs a Level 2 charger at home. The IRA's 30C tax credit puts $1,000 max on the install. Most state utilities layer their own $200 to $1,500 rebates on top. The shops that win are the ones who quote on-site with all three numbers built into the price. This lets the customer see the $585 net instead of the $1,485 retail.
The shops that win do two things differently. They run the panel load calc on-site so they know whether the install fits or needs a service upgrade. This avoids a surprise $2,800 panel on Day 1. They also file the IRA and utility rebate paperwork for the customer. This lets her get the $900 of credits she is entitled to without chasing her tax preparer in April.
The on-site quote with tax credit and rebate math is the engine. Panel load calc is what protects the install from a $2,800 surprise.
When you walk Mrs. Castillo's San Francisco Marina garage on a Sunday morning her new Tesla Model Y arrives Tuesday. The proposal builds itself in the app. Photograph the existing panel which is a 200A Square D QO from 1998 install in the garage. Photograph the meter which is PG&E 200A residential service. Photograph the proposed charger location on the interior wall of the garage 6 feet from the parking spot and 32-foot cable run from panel through the wall. Photograph the planned cable route as THHN in EMT conduit through the wall to the charger location. Run the NEC 220.83 load calc for existing dwelling general lighting and appliances at 12,800 VA and existing HVAC heat strip at 9,600 VA and existing pool pump and spa at 4,400 VA. Total existing is 26,800 VA on the 200-amp service for 48,000 VA capacity. Existing usage is 56 percent of capacity. Adding 48A continuous EV circuit for 11,520 VA brings total to 38,320 VA which is 80 percent of capacity. This is under the 80 percent NEC long-duration threshold. Install fits without panel upgrade. Customer picks the Tesla Wall Connector for HOL handshake and native Tesla integration. Build the quote for $1,485 including $475 Tesla Wall Connector and $1,010 install for 32-foot 6/3 cable and EMT conduit and 60A 2-pole breaker and wall mount and 2-hour electrician labor and permit and 18 percent margin. Subtract IRA 30C tax credit of $400 and PG&E EV charger rebate of $500 for $585 net to the customer. Customer sees the breakdown. She signs digitally and pays a $371 deposit. Install Saturday morning. Tesla charges Saturday night.
The Panel Load Calc
Panel load calc is what protects the customer from a $2,800 surprise on Day 1. Most EV charger installers eyeball the panel and quote $1,485 without running the math. Then Saturday morning the tech opens the panel and realizes the 200A service is at 92 percent capacity. The existing pool pump and spa and heat-strip HVAC and Tesla charger push it over the NEC 80 percent long-duration limit. The tech tells the customer actually you need a panel upgrade first for $2,800 more. Claver runs the NEC 220.83 load calc on-site during the quote for existing dwelling load plus new 48A continuous EV circuit. If the panel is at 78 percent post-install the EV circuit fits cleanly. If at 85 percent you need a load-management device like DCC-9 and you quote it now for $385 added. If at 92 percent you need a 200-amp service upgrade and you quote it now for $2,800 added. The customer sees the all-in number on Sunday and signs Sunday. Install proceeds Saturday without surprises.
1-visit install dispatch is what makes the 2 to 3 hour install profitable. Materials arrive Friday at the customer's house including Tesla Wall Connector and 60A 2-pole Square D QO breaker and 32 feet of 6/3 NM-B cable or 6 AWG THHN and EMT conduit and wall mount bracket and hardware. Saturday morning at 8am the tech arrives and opens the panel. He installs the 60A breaker on a slot location that does not conflict with existing tandem breakers. He runs the cable from the panel through the wall to the charger location with conduit on the visible runs per local code. He mounts the wall bracket and mounts the Tesla Wall Connector on the bracket. He terminates the cable at the charger and activates the charger via the Tesla app on the customer's phone. He runs a 60-second handshake test with her Tesla Model Y and hands her the keys. The job takes 2 to 3 hours total. Customer charges that night. One trip. One tech. One $1,485 paid invoice or $585 net after rebates.
Photo and Commissioning Documentation
Photo and commissioning documentation is what gets the PG&E rebate to approve in 5 days. Claver structures every install around timestamped photos. Pre-install photos show panel and meter and proposed charger location with measurements. During-install photos show the 60A breaker installed with proper torque and no double-tapping. They show the cable run with EMT conduit where required by local code and the wall mount and charger installation and the activated charger app screen showing serial number and firmware version. Post-install photos show the installed charger with the model number and serial visible as proof of qualifying Energy Star Level 2 unit eligible for both IRA 30C and PG&E rebates. They include commissioning data for charger handshake with vehicle test and charging speed verification of 9.6kW or 11.5kW depending on hardware. Every photo geo-tags. The PDF auto-bundles to the PG&E EV charger rebate application form. The PG&E rebate inspector approves the $500 rebate in 5 days instead of 5 weeks. The customer never has to file the IRS Form 8911 herself. Your office files it as part of the install package.
And here is where most EV charger installers fly blind regarding marketing spend. You are paying $25 to $50 per click on Google Ads for keywords like Tesla Wall Connector installer city and EV charger install. Some clicks become $585-net Tesla Wall Connector installs with rebates. Some become $4,800 200-amp service upgrade and EV charger jobs. Some become nothing. Claver captures the Google click ID when someone visits your site and tracks it through quote to signed contract to final payment and rebate received. Tesla Wall Connector installer San Francisco generated 18 clicks and 12 quotes and 6 signed jobs worth $8,910 which is a mix of straight installs and 2 service upgrades. EV charger installer near me generated 84 clicks and 1 quote and $1,485 in jobs. Triple the first campaign and cut the second.
Cancel anytime. 20-minute migration from your current tool.
Pricing
Pricing That Works for EV Charger Installers
$19/mo to start. $39/mo for growing teams. $79/mo for the full toolkit including AI summaries and app phone line and on-site quoting with IRA and rebate math and panel load calc and 1-visit install dispatch and photo and rebate documentation and Google Ads ROI. Same plans as every Claver page with no EV charger upsell.
Simple pricing, no free tier
Every plan includes unlimited jobs, quotes, invoices and Stripe payments. Texting and AI start on Crew. The phone system and full back office are on Business.
$1 for your first 14 days on Starter · Cancel anytime · Your data exports in CSV
Common questions
Common EV charger installer software questions
No marketing dance. The questions EV charger installers actually ask before they sign up.
Does Claver build on-site quotes with IRA 30C tax credit + utility rebate?+
Yes. Walk the garage with the customer. Photograph the panel + meter + proposed charger location + planned cable run. Run the panel load calc. Customer picks charger (Tesla Wall Connector $475 + install = $1,485 OR ChargePoint Home Flex $699 + install). Build the quote in 6 minutes, minus IRA 30C tax credit ($400 = 30% of $1,485 capped at $1,000) minus utility rebate ($500 PG&E EV charger rebate or local equivalent) = $585 net to the customer. Customer signs digitally and pays a 25% deposit through Stripe before you back out of the driveway.
Does it run NEC 220.83 panel load calculations?+
Yes. Claver runs the NEC 220.83 load calc on-site during the quote: existing dwelling general lighting + appliances + HVAC + pool/spa, plus the new 48A continuous EV circuit (11,520 VA on 240V). If the panel is at 78% post-install, the EV circuit fits cleanly. If at 85%, you need a load-management device (DCC-9 or similar). Quote it now ($385 added). If at 92%, you need a 200-amp service upgrade. Quote it now ($2,800 added). The customer sees the all-in number on Sunday, signs Sunday, install proceeds Saturday without surprises.
Does it document for utility rebate inspection (PG&E, ConEd, Eversource)?+
Yes. Claver structures every install around timestamped photos: pre-install panel + meter + proposed charger location with measurements, during-install photos of the 60A breaker installed (proper torque), cable run with EMT conduit, wall mount and charger installation, activated charger app screen showing serial + firmware. Post-install: photo with model number + serial visible (proof of qualifying Energy Star Level 2 unit eligible for IRA 30C and utility rebates) + commissioning data (charger handshake with vehicle test, charging speed verification). The utility rebate inspector approves the $500 rebate in 5 days instead of 5 weeks. Your office also files the IRS Form 8911 for the customer as part of the install package.
Can I import customers from ServiceTitan, Housecall Pro, or Jobber?+
Yes. Export your customer list as CSV from your current tool, ServiceTitan, Housecall Pro, Jobber, FieldEdge, and upload it to Claver. The wizard maps the columns. Most EV charger installers finish the migration in 20-30 minutes. We'll personally help if anything looks off. Email [email protected].
What does Claver cost for an EV charger installer?+
$19/mo for Starter (2 users). $39/mo for Crew (8 users) when you want texting, AI, and the dispatch board. $79/mo for Business with the full toolkit, on-site quoting with IRA + rebate math, NEC 220.83 panel load calc, photo + rebate documentation, IRS Form 8911 filing for customer, Google Ads conversion tracking. No contract. Cancel anytime.
Your current software owns your customer list. We don't want to.
Your data exports as CSV the day you leave — your full customer list, every job, every invoice. Your payments go directly through your own Stripe, never ours. Claver starts at $19/mo flat, no contract, no per-seat fees.
Start your $1 trial
14 days for $1, then $19/mo. Cancel any time from settings.