Free Tool
Epoxy Floor Coating
Epoxy Floor Coating
Quote Calculator
Enter square footage, system type, and prep work to get a complete epoxy floor coating quote. No signup required, runs in your browser.
no signup · runs in your browser
Job details, fill in the fields below
Square footage
sq ft
A typical 2-car garage is 400 to 500 sq ft.
System type
Rates (editable)
$
$
Prep and add-ons
cracks
$35 per crack repaired.
lf
$6.00 per linear foot installed.
Quote estimate
Total quote
$0.00
all-in estimate
Price per sq ft installed
$0.00
installed
Material cost$0.00
Labor cost$0.00
Prep / add-ons subtotal$0.00
A typical 2-car garage is 400 to 500 sq ft. Adjust rates for your local market and system pricing.
Other tools contractors use
Customer lifetime value calculator
Revenue per visit, retention rate, and gross margin give you the true value of one customer.
Dispatch schedule template
A live day board with one column per tech, hour blocks, status flags, and a callbacks list.
Field service report template
Test readings, parts, labor, and a customer sign-off line, ready to print as a PDF.
Keep the numbers when the job is booked
Inside Claver the same estimate becomes the quote you send, and the quote becomes the invoice you get paid on, so nobody retypes a price between the driveway and the bank.
Start for $1$1 for 14 days, then $19/mo. Card required. Cancel any time.
Epoxy floor coating cost FAQ
Common questions about epoxy floor coating pricing and this calculator.
How much does epoxy floor coating cost per square foot?
Epoxy floor coating costs range from $3.00 to $12.00 per square foot installed depending on the system. A single-coat epoxy on a prepared surface runs $2.40 to $4.00 per square foot. A full broadcast flake system with topcoat typically lands between $4.50 and $7.00 per square foot. Metallic and full commercial polyurea systems cost $6.00 to $12.00 per square foot installed.
How long does epoxy flooring last?
A properly applied 2-part epoxy with a polyurea topcoat on a well-prepared concrete surface lasts 10 to 20 years in a residential garage. Commercial floors under heavy traffic or chemical exposure may need recoating every 5 to 10 years. Single-coat DIY epoxy typically lasts 3 to 5 years before peeling.
Do I need to grind the concrete before epoxy?
Yes, concrete surface preparation is the most critical step in an epoxy coating job. Diamond grinding or shot blasting opens the concrete pores so the epoxy bonds to the slab rather than sitting on top of it. Skipping this step is the leading cause of epoxy delamination and peeling within the first year.
What is the difference between epoxy and polyurea?
Epoxy is a two-part coating that forms a hard, chemical-resistant surface. It is typically used as the base coat. Polyurea is a faster-curing topcoat that is more flexible, UV-stable, and abrasion-resistant than epoxy alone. Most professional floor coating systems use epoxy as a base and polyurea as the finish coat for the best combination of adhesion and durability.
Can Claver manage epoxy flooring jobs with before-and-after photo tracking?
Yes. Claver lets flooring crews log before and after photos to each job record, track job phases from prep through topcoat cure, and invoice customers when the job is complete. All photos are stored with the customer record.